Angang Heavy Machinery Pumping Vacuum and Reserve 20t/h Gas Boiler Project

鞍钢重型机械抽真空备用20t1 鞍钢重型机械抽真空备用20t2

Angang Heavy Machinery Pumping Vacuum and Reserve 20t/h Gas Boiler Project

      On November 5, 2012, our institute and Angang Heavy Machinery Co., Ltd. signed a vacuum standby 20t/h gas boiler project. This project covers an area of 330.75 square meters and a total construction area of 479.25 square meters.

  This project is the first boiler general contracting project of our hospital. The boiler room is a single-story factory building with a concrete bent frame structure. The cornice height is 9.2m, and the cornice height of the attached fan room is 7.15m; the auxiliary room is a frame structure, 3 floors, and the cornice height is 17m. . Our institute has now completed the relevant design of the boiler body and auxiliary equipment, completed various approvals, and cooperated with the construction team to solve the actual problems on the spot to ensure the progress and quality of the project.
       The general contract design of this project has laid the foundation for our institute to undertake such boiler general contract projects in the future.